Wer die TM12 Prüfung zum ersten Mal ablegt, kennt oft weder Ablauf noch Zeitdruck der echten Prüfungssituation. Der Desktop Test Engine und der Online Test Engine von ITZert simulieren genau dieses Umfeld, damit Sie bei der BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) Prüfung nichts überrascht.
BCS TM12 Prüfungsübersicht:
| Zertifizierungsanbieter: | BCS / ISTQB |
|---|---|
| Prüfungsname: | ISTQB-BCS Certified Tester Advanced Level - Test Manager (2012) |
| Prüfungsnummer: | TM12 |
| Anzahl der Fragen: | 65 |
| Prüfungsdauer: | 180 Minuten |
| Gültigkeitsdauer des Zertifikats: | Lebenslang gültig |
| Verfügbare Sprachen: | Englisch |
| Verwandte Zertifizierungen: | ISTQB Certified Tester Advanced Level - Technical Test Analyst ISTQB Certified Tester Foundation Level (CTFL) ISTQB Certified Tester Advanced Level - Test Analyst |
| Mindestpunktzahl: | 65 % |
| Prüfungsformat: | Ohne Hilfsmittel, Komplexe Multiple-Choice-Aufgaben |
| Beispielfragen: | ![]() |
| Prüfungsmethode: | Prüfung am Computer oder in Papierform durch akkreditierte BCS-/ISTQB-Prüfungsanbieter; je nach Anbieter ist eine Teilnahme vor Ort oder online möglich. |
| Voraussetzungen: | Teilnehmer müssen über das Zertifikat ISTQB Certified Tester Foundation Level (CTFL) verfügen und in der Regel über praktische Erfahrung im Softwaretest verfügen. |
| Offizielle Syllabus-URL: | https://www.bcs.org/qualifications-and-certifications/certifications-for-professionals/software-testing-certifications/istqb-certified-tester-advanced-level-test-manager/ |
BCS TM12 Prüfungsthemen:
| Abschnitt | Gewichtung | Ziele |
|---|---|---|
| Thema 1: Fehlermanagement | 10 % | - Lebenszyklus von Fehlern
|
| Thema 2: Soziale und Führungskompetenzen | 7 % | - Teamführung
|
| Thema 3: Testmanagement | 40 % | - Tätigkeiten im Testmanagement
|
| Thema 4: Werkzeuge und Testautomatisierung | 8 % | - Unterstützung durch Werkzeuge
|
| Thema 5: Testprozess | 20 % | - Testprozess
|
| Thema 6: Prüfungen und Reviews | 10 % | - Steuerung von Reviews
|
| Thema 7: Verbesserung des Testprozesses | 5 % | - Prozessverbesserung
|
Fragen und Antworten rund um die TM12 Prüfung von BCS
Die TM12 Prüfung ist die offizielle Prüfung von BCS für die Zertifizierung „Test Manager" auf der Stufe Fortgeschritten / Professionell. Sie steht zudem in Verbindung mit folgenden Zertifizierungen: ISTQB Certified Tester Foundation Level (CTFL), ISTQB Certified Tester Advanced Level - Test Analyst, ISTQB Certified Tester Advanced Level - Technical Test Analyst. Wer diese Prüfung ablegt, weist fundierte Kenntnisse im Themenfeld der BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) nach. Mit den 65 Übungsfragen von ITZert bereiten Sie sich gezielt auf Inhalte und Fragetypen der Prüfung vor.
In der TM12 Prüfung bearbeiten Sie 65 Fragen innerhalb von 180 Minuten. Rechnet man das grob auf die einzelne Frage herunter, wird klar, warum ein festes Zeittempo entscheidend ist: Lassen Sie sich bei schwierigen Fragen nicht festbeißen, markieren Sie diese und kehren Sie am Ende zu ihnen zurück. Trainieren Sie dieses Zeitmanagement vorab mit dem Test Engine von ITZert im Zeitmodus, damit Sie am Prüfungstag nicht unter Druck geraten.
Teilnehmer müssen über das Zertifikat ISTQB Certified Tester Foundation Level (CTFL) verfügen und in der Regel über praktische Erfahrung im Softwaretest verfügen.
Da sich Zulassungsbedingungen ändern können, bestätigen Sie die aktuellen Angaben bitte zusätzlich auf der offiziellen Seite von BCS.
Die Anmeldung zur TM12 Prüfung erfolgt über den folgenden offiziellen Kanal:
Die Prüfung selbst wird auf folgende Weise abgelegt: Prüfung am Computer oder in Papierform durch akkreditierte BCS-/ISTQB-Prüfungsanbieter; je nach Anbieter ist eine Teilnahme vor Ort oder online möglich..
Zur Vorbereitung auf die TM12 Prüfung empfiehlt BCS offiziell folgende Trainings:
Als praktische Ergänzung zu diesen Kursen finden Sie bei ITZert 65 prüfungsnahe Übungsfragen, mit denen Sie das Gelernte unter realistischen Bedingungen anwenden und Ihren Wissensstand überprüfen.
Ja. Für die TM12 Unterlagen steht eine kostenlose PDF-Demo zum Herunterladen bereit – so prüfen Sie Qualität und Aufbau der Fragen in Ruhe, bevor Sie kaufen. Nach dem Kauf erhalten Sie außerdem 365 Tage lang kostenlose Updates; läuft dieser Zeitraum ab, verlängern Sie den Update-Service mit 50 % Rabatt.
Falls Sie die zugehörige Prüfung innerhalb von 60 Tagen nach dem Kauf nicht bestehen, können Sie eine vollständige Rückerstattung beantragen. Voraussetzungen: Der Name des Prüfungsteilnehmers muss mit dem Namen des Zahlers übereinstimmen, und Sie reichen innerhalb von 2 Tagen nach dem Prüfungstermin eine eingescannte Anmeldebestätigung (Enrollment Slip) sowie das offizielle Score Report als PDF ein – die Bearbeitung erfolgt innerhalb von 7 Tagen. Nicht erstattungsfähig sind Prüfungen, die innerhalb von 3 Tagen nach dem Kauf abgelegt wurden, lediglich heruntergeladene, aber nicht angetretene Prüfungen sowie kostenlose Materialien und abgelaufene Bestellungen.
Alternativ zur Rückerstattung können Sie einen Produktwechsel wählen: Sie erhalten kostenlos zwei gleichwertige Prüfungsunterlagen Ihrer Wahl und behalten den Update-Service für das ursprünglich gekaufte Produkt.
Die Lieferung erfolgt digital: Der Download steht sofort nach der Zahlung bereit, die Liefer-E-Mail erreicht Sie in der Regel innerhalb einer Minute. Sollten Sie nach 2 Stunden nichts erhalten haben, wenden Sie sich bitte an unseren Kundenservice. Eine Begrenzung der Installationen gibt es nicht – Sie nutzen die Software auf beliebig vielen Computern.
Die TM12 Prüfung gliedert sich in 7 Themenbereiche. Zu den wichtigsten zählen:
- Prüfungen und Reviews (10 %)
- Soziale und Führungskompetenzen (7 %)
- Testprozess (20 %)
Die vollständige Aufstellung aller Bereiche samt Gewichtung finden Sie in der Prüfungsübersicht weiter oben auf dieser Seite.
BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) TM12 Prüfungsfragen mit Lösungen
Frage #1
You are the Test Manager of a new project aimed at developing a software system that must be certified at level B of the DO-178B standard. The project will follow a V-Model software development life cycle and it will have four formal levels of testing: component, integration, system and acceptance testing.
You must produce the test plan documentation for this project by providing an adequate coordination across the four levels of testing in order to assure auditability.
Which of the following answers would you expect to best describe how to organize the test plan?
Number of correct responses: 1
A. Produce a single master test plan that covers in detail all four levels, describing the particular activities for all test levels
B. Produce a master test plan describing the relationship between the four levels, and four separate detailed level test plans, one for each level
C. Produce four separate detailed level test plans, one for each level, without a master test plan
D. Produce a master test plan that covers three levels (component, integration, system test) and a separate acceptance test plan
Frage #2
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.
The requirements specification document contains several SLAs (Service Level Agreements) like the following:
SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.
Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?
Number of correct responses: 1
A. Perform static performance testing by reviewing the architectural model of the system under various load levels
B. Perform system performance testing, consisting of several performance testing sessions, to verify if all the SLAs have been met
C. Monitor the SLAs after the system has been released into the production environment
D. Perform unit performance testing for each single web service
Frage #3
An agile development team decides to hire a tester who has always worked:
-in independent test teams, reporting the problems found in a defect tracking system
-in safety-critical projects, with a stronger focus on the quality of the product than on time and budget.
This agile team is focused on short-term goals to get the product released on time and within budget.
Which of the following answers would you expect to be most likely true in this scenario?
Number of correct responses: 1
A. The tester can continue to report the problems found in a defect tracking system and be more focused on the quality than on time and budget constraints
B. Agile teams like the presence of a tester in their teams and the tester will be able to adapt to the new context without any issue
C. The developers will immediately follow the guidelines described by the tester
D. The tester's mission could be to verify adherence to requirements, instead of reporting formally the problems in a defect tracking system
Frage #4
You are estimating the effort for the integration testing activities of a new project. Consider the following factors, which can affect that estimation:
I. Availability of re-usable test systems and documentation from previous, similar projects
II. Unexpected timing of components arrival
III. Stability of the integration test team (no turnover)
IV. Many and geographically distributed sub-teams
Which of the following statements is true?
Number of correct responses: 1
A. I and II. can negatively affect the estimation
III and IV. usually favor the accuracy of the estimation effort
B. II. and III. can negatively affect the estimation
I and IV. usually favor the accuracy of the estimation effort
C. III. and IV. can negatively affect the estimation
I and II. usually favor the accuracy of the estimation effort
D. II. and IV. can negatively affect the estimation
I and III. usually favor the accuracy of the estimation effort
Frage #5
In your organization the following tools of the same vendor are currently in use: a requirements management tool, a test management tool and a bug tracking tool.
You are the Test Manager.
You are currently evaluating a test automation tool of the same vendor (to complete the vendor's tool suite) against an interesting open-source test automation tool under the GNU GPL (General Public License).
There are no initial costs associated to that open-source tool.
Which of the following statements associated to the selection of the open-source tool is correct in this scenario?
Number of correct responses: 1
A. The open-source tool can be modified but it can't be distributed further in any way
B. There are no initial costs for the open-source tool but you should carefully consider the costs associated to the integration with the existing tools and also evaluate the recurring costs
C. The open-source tool can be modified but only if the community of developers of that tool gives you the formal permission to modify it
D. There are no initial costs for the open-source tool because open-source tools are usually low-quality, while vendor tools have always a better quality than the corresponding open-source tools
Fragen und Antworten:
| Frage #1 Antwort: B | Frage #2 Antwort: C | Frage #3 Antwort: D | Frage #4 Antwort: D | Frage #5 Antwort: B |




1312 Kundenrezensionen


Aufhauser -
Meiner Meinung nach ist dises Lernmaterial sehr gut. Es ist gut geschrieben und leicht zu verstehen. Ich habe in der letzten Woche die Prüfung TM12 bestanden. Wenn Sie gute Studienmaterial für die Zertifizierungsprüfung noch suchen, ist es eine gute Alternative.